Recently I tried to place the soil in the side plate of an A4WD3 kit, i.e. step 1 of the assembly (in the Lynxmotion assembly docu under the title “01 Frame Base”): 01 - Frame Base
However, I could not figure out a way without damaging the seal by somehow hammering it in. How is this supposed to be done properly, i.e. without seal damage?