Project Phoenix Excel program + Manual

FYI - I also have excel 2007, (wish I was using 2003 :cry: ), I don’t get an error when I load the latest version beta of pep that I downloaded. But it gets loaded into what they consider to be compatability mode. They give you a one way to convert to the new 2007 format with all of the new features and the like. Not sure if my data is correct however… I don’t have the problem with the ;s showing up, but I get a lot of numbers like 7.10E-14 as pin numbers. I wonder if I cut and paste a couple of rows here if it would work…

97 Comment SEQUENCE STEP PIN0 PIN1 PIN2 PIN4 PIN5 PIN6 PIN8 PIN9 PIN10 PIN16 PIN17 PIN18 PIN20 PIN21 PIN22 PIN24 PIN25 PIN26 T0 T1 T2 T4 T5 T6 T8 T9 T10 T16 T17 T18 T20 T21 T22 T24 T25 T26 TMAX TTOTAL INFO1 140 Flip box 1 1 7.10E-14 0 0 1.80E-13 0 0 0 0 0 0 0 0 1.80E-13 0 0 0 0 0 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 Flip box Transition 12s to next pose 1 2 7.10E-14 0 0 1.80E-13 0 0 0 -31.248 -25.278 0 0 0 1.80E-13 0 0 0 0 0 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 Transition 12s to next pose 0 1 3 7.10E-14 0 0 1.80E-13 0 0 -20 -31.248 -25.278 0 0 0 1.80E-13 0 0 0 0 0 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 0 1 4 7.10E-14 0 0 1.80E-13 0 0 -20 1.53E-10 0.000112 0 0 0 1.80E-13 -31.248 -25.278 0 0 0 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160 160

Here are like rows 5-9 of that page…

Kurt